Top-speed melting could be achieved within 4 minutes, 100% duty cycle, 24hours continuous working greatly improves the efficiency of production.
Technical Parameters
Production introduction:
Top-speed melting could be achieved within 4 minutes, 100% duty cycle, 24hours continuous working greatly improves the efficiency of production.
Technical Parameters:
Model number | VF-H1 | VF-H2 | VF-H5 | VF-H8 |
Power source | Single phase 220V±10%, 50/60Hz | Single phase 220V±10%, 50/60Hz | Three phase 380V±10%, 50/60Hz | Three phase 380V±10%, 50/60Hz |
Power | 3.5 kw | 3.8 kw | 15 kw | 25 kw |
Applicable metal | Gold, Silver, Copper, Brass, Bronze, and their alloys | Gold, Silver, Copper, Brass, Bronze, and their alloys | Gold, Silver, Copper, Brass, Bronze, and their alloys | Gold, Silver, Copper, Brass, Bronze, and their alloys |
Melting time | 2 minutes | 2 minutes | 4 minutes | 4 minutes |
Max capacity | 24K Gold: 1.2 kg 18K Gold: 1.0 kg 925 Silver: 0.6 kg | 24K Gold: 2.6 kg 18K Gold: 2.0 kg 925 Silver: 1.2 kg | 24K Gold: 7.0 kg 18K Gold: 5.0 kg 925 Silver: 1.5-3.0 kg | 24K Gold: 8.5-9.6 kg 18K Gold: 7.0-8.0 kg 925 Silver: 3.0-4.0 kg |
Max temperature | 1600℃ | 1600℃ | 1800℃ | 1800℃ |
Temperature control k-type | Optional | Optional | Optional | Optional |
Dimension | 320*280*550mm | 340*380*680mm | 530*530*900mm | 680*500*1180mm |
Weight | 20 kg | 25 kg | 72 kg | 92 kg |
Heating technology | Induction heating | Induction heating | IGBT Induction heating | IGBT Induction heating |
Water pump | Optional | Optional | Equipped | Equipped |